Site Excavation
Saturday, April 25th, 2009Now that we have settled on using solder piles, our engineer has started importing the information into his drawings. I then take his information and import it into our model. Here is a quick look at the existing site with the piles driven into the ground prior to excavation followed by an image of the excavation.

