Posts Tagged ‘solder piles’

Site Excavation

Saturday, April 25th, 2009

Now that we have settled on using solder piles, our engineer has started importing the information into his drawings.  I then take his information and import it into our model.  Here is a quick look at the existing site with the piles driven into the ground prior to excavation followed by an image of the excavation.

beforeafter